CHANGE ORDER
Yacht For Sale
€3,599,000
CHANGE ORDER


\'Change Order\' is one of the newest Hatteras GT59s available. She is broken in and ready for the next owner. This 3 stateroom, 2 head layout with the master aft and tackle room provides the comfort and fishability for long extended fishing excursions. The main deck layout has the preferred peninsula galley with subzero drawer fridges, range and a dinette to stbd.  Also to stbd is a popup TV in the Satin teak cabinet and bottle storage with icemaker. The salon sofa has storage and a coffee table with storage that can raise to dining level. 

Equipped with Cat C32s, she cruises at 30 knots and has a top end of 37 knots. These engines are still under Platinum Plus warranty until 2025 and can be extended further. 

All new Garmin electronics package in 2022. 

  

  • Interior Cabinetry In Satin Finished Teak 

  • Leather Sofa With Storage And Pull Out Berth 

  • Teak Coffee Table In High Gloss Teak With Flip Up Desk Style Top, Storage 

  • Leather Dinette With Storage Under And High Gloss Teak Table

  • Carpet Flooring With Amtico Floor At Entry Door

  • Samsung 40\" Tv With Electric Lift In Teak Counter Fwd Of Dinette

  • Denon Salon Av/Receiver - Model avrx3600hbke3 

  • KVH Sat TV

  • Samsung Blue-Ray Player

  • Definitive Technology Subwoofer - Model Supercube 2000

  • Two Jenn-Air Drawer Fridges (2 Drawers Each) - Model judfp242hxo1

  • Miele 4 Burner Electric Cooktop - Model km56212

  • Sharp Microwave - Model R-1881lsy

  • U-Line Icemaker Opposite Galley - Model uln-B195cb-03a

  • Emerson Garbage Disposal In Stainless Steel Sink

  • Corian Blue Countertops 

  • Storage Cabinets & Full Height Pantry

  • Amtico Flooring

  • Bottle Storage In Bar Opposite Galley
  • Large Doghouse Storage Forward Of Galley

MASTER STATEROOM AFT

  • Queen Berth with Storage

  • Cedar Lined Hanging Closet

  • Nightstands with Drawers

  • Cabinet Storage 

  • TV & Soundbar Built in to Wall

  • Head with Separate Shower 

  • Solid Surface Countertops

  • Mirorred Medine Cabinet

Tackle Room To Stbd

  • Solid Surface Countertops

  • Lockable Storage For Rods/ Reels

  • Storage Cabinets

Bunk Stateroom To Stbd

  • Over Under Bunks

  • Nightstands With Storage For Both Berths

  • Cedar Lined Hanging Locker

Vi Stateroom

  • Queen Berth 

  • Flip Up Bed With Storage Underneath

  • Cedar Lined Hanging Lockers

  • Storage Overhead In Bulkheads

  • Head With Separate Shower

  • Solid Surface Countertops & Floors In Head

  • Mirrored Medicine Cabinet

Companion Laundry

  • Haier Full Size Vented Dryer (New in 2022)
  • Haier Full Size Vented Washer (New in 2022)

 

  • Wing board Rod Holders 3-Port, 3- Starboard
  • Circulating Livewell with LED lighting in Transom Fish Box
  • Lift Up Coaming Gate
  • Companion Helm Chair Port Side
  • High Gloss Teak Helm Pod
  • 8 Cubic Foot Top Loaded Freezer on Flybridge
  • Electric Bow Thruster
  • Raw Water Wash Down Outlet
  • Bow Stainless Anchor Shoot and Windlass
  • Pipewelders Hardtop with Outriggers
  • Eskimo Ice chipper Feeds into Stbd Deck Fishbox
  • Swim Platform
  • Electric Grill in Cockpit
  • Fresh Water Washdown Bow Locker
  • Gunnel Racks for Storage
  • Teak Covering Boards in Cockpit
  • Lumitec Sea Blaze Underwater Lights
SPECIFICATIONS
Type
Motor
Build
Hull
Fiberglass
Year
2021
Cabins
3
Length
17.98m (59ft)
Beam
5.71m (19ft)
Speed
30(Cruising)
ASKING PRICE
€3,599,000
Contact a Broker
+33 609 96 01 02
E-MAIL
Image Gallery